Energieeffizientes und nachhaltiges Bauen: Wie das aussehen kann, zeigt das Plus-Energie-Haus vom BMVBS (Bundesministerium für Verkehr, Bau und Stadtentwicklung), das auch innovative Technik von WAGO beinhaltet.
An impressive building complex was erected in the Häverstädt District of Minden. 1,100 km of cabling was laid to connect the lighting and outlets alone. The hospital decided to use the plug-in electrical connection with the WINSTA connector system.
TU Darmstadt wins international competition "Solar Decathalon 2007" in the USA. WAGO assisted the school of Architecture at the TU Darmstadt with its project "Low-energy House", providing them with WINSTA®, TOPJOB®S rail-mounted terminal blocks and the Series 222 connecting terminals.