Content: Start a new project with the PPC/DER or use the WAGO Application note.
Target Group: Operators of energy generation plants who want to use the PPC/DER desired by the grid operator.
Prerequisites: Basic knowledge of telecontrol technology (RTU)
Speaker: Benjamin Wolf, Seminar and Training