[ { "uid": "link_contact", "linkName": "Contact", "url": "/global/contact#wago-support-contact-anchor", "target": "_self", "classAttributes": "phone" } ]
[{"term":"Libraries_BA","id":0,"type":"QUICKLINKS"},{"term":"Instructions","id":1,"type":"QUICKLINKS"},{"term":"WAGO-I/O-PRO","id":2,"type":"QUICKLINKS"},{"term":"Building","id":3,"type":"QUICKLINKS"},{"term":"221","id":4,"type":"QUICKLINKS"}]
MM-15767_webinar_product_trainings_2000x666.jpg
Recording

Commissioning of Power plant controller (DER) Part 2

Practical implementation of the WAGO PPC/DER with CODESYS V3.5.

Content: Start a new project with the PPC/DER or use the WAGO Application note.
Target Group: Operators of energy generation plants who want to use the PPC/DER desired by the grid operator.
Prerequisites: Basic knowledge of telecontrol technology (RTU)
Speaker: Benjamin Wolf, Seminar and Training