News
General Terms and Conditions

WAGO wants to be the best possible business partner for each customer. To us, this also means providing all-inclusive and transparent information about all applicable conditions and contractual details under which we act, cooperate and share our expertise, in advance and unprompted.

GENERAL TERMS AND CONDITIONS OF SALE OF WAGO ELECTRONIC PTE LTD

I. SCOPE OF SUPPLIES OR SERVICES

1. The scope of supplies or services shall be governed by mutual declarations in writing. Where an agreement has been entered into without such mutual declarations in writing, either the written order confirmation by WAGO Electronic Pte Ltd (hereinafter called the "Supplier") shall govern, or where such written order confirmation has not been issued, the written order of the purchaser (hereinafter called the "Purchaser").

2. Protective devices will be supplied to the extent required by law or where expressly agreed upon.

3. All supplies or services shall be governed by the rules of the Verband Deutscher Elektrotechniker (Association of German Electrical Engineering) insofar as safety of services is concerned. Deviations are permissible if the same safety standard will be achieved by different means.

4. The Supplier reserves all titles and property rights, and all rights originating from copyright on cost estimates, drawings and other documents of which no disclosure shall be made to third parties without the prior consent of the Supplier. All drawings and any other documents pertaining to quotations shall on request be returned immediately to the Supplier if the order is not placed with the Supplier. The foregoing sentences 1 and 2 in this paragraph 4 shall apply accordingly to the Purchaser. They may, however, be made available to those third parties which perform services or supplies for the Supplier in cases where this is permitted

5. Additional agreements shall not be binding unless confirmed in writing.

II. PRICES

Where supply offered does not include erection or installation, prices quoted are ex works excluding packing.

III. RETENTION OF TITLE

Title to all goods is retained by the Supplier until each and every claim of the Supplier

against the Purchaser originating in the business relations has been duly satisfied.

Prior to this event goods shall not be pledged or given as security and shall only be

resold by resellers in the normal course of business, against payment from their

customers. Any costs incurred in connection with interventions following this Section

shall be borne by the Purchaser.

If the value of the sureties accruing to the Supplier in performance of sentence 1 of the

first paragraph of this Section III exceeds the value of all privileged claims by more

than 20%, the Supplier shall upon request release a respective part of the sureties.

IV. CONDITIONS OF PAYMENT

1. Payment shall be made free of all taxes and charges of whatsoever nature to

the paying office of the Supplier.

2. The Purchaser may set off only such claims as are undisputed or finally

determined.

V. PERIOD FOR SUPPLY OF DELIVERIES OR SERVICES

1. The period for supply of deliveries and services shall be governed by the mutual

written declarations. Sentence 2 of Section I paragraph 1 shall apply

accordingly. Timely supply is conditioned upon timely receipt of all documents

to be furnished by the Purchaser which includes necessary licenses and

releases, timely clarification and approval of plans and observance of the terms

of payment agreed upon and all other obligations.

If theses conditions are not timely fulfilled, the period for supply shall be

appropriately extended.

2. The above period shall be deemed to have been met:-

a) where supply does not include erection or installation, if the goods, ready

for operation, have been delivered to the carrier or picked up within the

agreed period. If delivery is delayed for reasons for which the Purchaser

is responsible, supply shall be deemed timely, if notice that goods are

ready for shipment has been given within the agreed period; or

b) where supply includes erection or installation, if such erection or

installation has been completed within the agreed period.

3. If the period for the supply of deliveries or services can be proven to have been

exceeded because of mobilisation, war, riot, strike, lockout, or in the event of

unforeseeable circumstances, such period shall be adequately extended.

If such period is exceeded for reasons other than those stated in this subsection

3 paragraph 1, the Purchaser, insofar as he can establish credibly that he has

suffered damage owing to the delay, may claim liquidated damages of 0.5% for

every completed week's delay up to an overall total of 5% of the value of that

part of the supplies or services which could not be taken into useful operation

owing to the individual components thereof not having been furnished on time.

The Purchaser shall likewise be entitled to liquidated damages in the case of

circumstances described under this subsection 3 paragraph 1 arising only after

the period of supply of deliveries or supplies originally agreed upon has been

culpably exceeded by the Supplier. All further damages for delay as may be

claimed by the Purchaser exceeding the margin of 5% as ruled under this

subsection 3 paragraph 2 are expressly excluded even if an additional period of

time as may have been granted to the Supplier has expired. This does not

apply where in cases of intent or gross negligence the Supplier's liability is

enforced by law.

The right of the Purchaser to cancel the Contract after an additional period of

time which has been granted to the Supplier has ineffectively expired shall

remain unaffected.

4. If shipment or delivery is delayed at the Purchaser's request, storage costs to

the sum of 0.5% of the invoiced amount will be charged for every month

commencing on the first month after notice has been given that goods are

ready for shipment. Such charges shall be limited to an overall total of 5%

unless costs incurred are proven to be higher.

VI. TRANSFER OF RISK

Risk shall pass to the Purchaser, even if freight delivery paid has been agreed upon:

a) where the supply offered does not include erection or installation whenever

goods ready for operation have been delivered to the carrier or picked up by the

carrier. Every care shall be taken in packing. Shipment shall be carried out to

the best of the Supplier's judgment. At the request and expense of the Purchaser,

goods shipped will be insured by the Supplier against breakage, damages in transit or fire;

b) where supply offered includes erection or installation, on the day the Purchaser

has taken over goods for operation insofar as a test run has been agreed upon,

whenever such a test run has been satisfactorily completed. The assumption

hereto is that the test run or taking over for operation shall take place

immediately following erection or installation declared ready for operation.

If the Purchaser fails to accept the offer of a test run or to take over for

operation, risk for the period of delay arising therefrom shall pass to the

Purchaser after a period of 14 days following such offer; or

c) if shipment, delivery, commencement or execution of erection or installation is

delayed at the request of the Purchaser or for reasons within the Purchaser's

responsibility, risk shall pass to the Purchaser for such period of delay. The

Supplier however undertakes to effect at Purchaser's expense such insurance

as requested by the Purchaser.

VII. ERECTION AND INSTALLATION

A.

Insofar as nothing to the contrary has been agreed upon in writing the following

provisions shall apply to erection and installation of any kind.

a) The Purchaser shall provide at his expense and in due time:

1. in sufficient number, auxiliary personnel such as labourers and if

necessary, bricklayers, carpenters, fitters, crane operators and other

skilled labour along with the required tools;

2. all earth work, foundations, civil engineering, mortising, scaffolding,

plastering, painting and other work not usual in the Supplier's trade

including the necessary materials;

3. such objects and materials as are necessary for erection and putting into

operation e.g props, wedges, bases, cement, cleaning and ceiling

materials, lubricants, fuel, etc furthermore scaffolds, lifting gear and

other devices;

4. power, water including the necessary connections up to point of use,

heating and general lighting;

5. suitable and dry rooms of sufficient size at the site which can be locked

for storage of machinery parts, equipment, materials, tools etc as well as

adequate working rooms and accommodation for the Supplier's

personnel including reasonable sanitary installation. Furthermore, the

Purchaser must follow the same provisions for safe guarding the

property of the Supplier and erection personnel at the site as he would

for his own; and

6. protective clothing and protecting devices which are necessary owing to

particular conditions at the site(s) and which are not usual in the

Supplier's trade.

b) Before commencement of erection work, the Purchaser must make available of

his own accord necessary information concerning all concealed, electric

cabling, gas or water pipes and the like as well as necessary information on statics.

c) Before commencement of erection or installation, the parts required for initiating

the work must be at hand and all masonry, carpentry and other preparatory

work must be so far advanced that erections or installations may began

immediately upon arrival of erection and installation personnel and proceed

without interruption. In particular, the approach roads and the site for erection

or installation itself must be level and clear, foundations must be dry and set,

foundation walls erected and backfilled, and the case of indoor work, the

rendering of walls and ceilings must be complete and especially doors and

windows must have been fitted.

d) If installation, erection or commencement of operation is delayed owing to

circumstances particularly at the site the Supplier shall not be held responsible.

The Purchaser shall bear the reasonable costs for standby time and any

additional travelling expenditures of erection or installations personnel.

e) Working hours shall be certified at weekly intervals to erection and installation

personnel by the Purchaser to the best of his knowledge. Moreover, the

Purchaser shall immediately confirm in writing to erection or installation

personnel completion of erection or installation work.

f) The Supplier shall not be liable for any work executed by his erection or

installation personnel or other agents that is not related to supplies and erection

or installation or insofar as it has been initiated by the Purchaser.

B.

If the Supplier has undertaken to provide erection or installation on an actual cost

basis, the following conditions shall apply in addition to those under A:

1. The Purchaser shall make payment to the Supplier according to the rates of

charge for working hours agreed upon at the time of order together with

premiums for overtime, night, Sunday, or holiday work, work under unusually

difficult conditions, planning and supervision.

2. Moreover the following costs shall be paid separately:

a) Travelling expenditures, costs for transport of tools and personal

luggage.

b) Daily allowance for working hours as well as for off days and holidays.

VIII. ACCEPTANCE

1. Goods delivered shall be accepted by the Purchaser even if they show minor

defects.

2. Unless otherwise agreed, the Purchaser of the goods shall be bound to accept

delivery thereof by instalments.

IX. LIABILITY FOR FAULTS

The Supplier shall be liable for faults including failure to achieve assured

characteristics as under:-

1. The Supplier shall at his discretion repair or replace such part(s) or perform

anew such services free of charge as have become of no use markedly

impaired in usefulness within 24 months after the transfer of risk, regardless of

actual operating time, owing to circumstances prior to transfer of risk,

particularly such faulty design, materials or workmanship. The Supplier must be

informed in writing of such faults immediately after they have been noticed.

2. The Purchaser has to comply with his contractual obligations, in particular with

the agreed conditions of payment. If complaints in respect of which a fault is

made the Purchaser may withhold payments to an extent which is fair and

reasonable with respect to the faults occurred.

However, if the Contract is entered into in pursuance of the Purchaser's line of

business, payments may only be withheld under the condition that the complaint

in respect of which a fault is justified beyond any reasonable doubt.

3. The Purchaser shall grant the Supplier such adequate time and opportunity as

the Supplier deems reasonable to remedy the fault. In case of refusal the

Supplier's liability shall be deemed to be waived by the Purchaser.

4. If the Supplier lets expired an adequate extension of time as set by the

Purchaser without remedying the fault the Purchaser shall have the right to

cancel the Contract (cancellation) or claim a reduction of price (reduction).

5. The right of the Purchaser to lodge claims owing to faults shall in any case be

barred after a period of 12 months has expired beginning from the date of the

above complaint. If no agreement is reached within this period of time the

Supplier and the Purchaser may agree to an extension of the said period.

6. Liability for faults does not cover natural wear and tear nor damage arising after

transfer of risks owing to faulty and negligent handling, excessive strain,

unsuitable materials for operation, deficient civil engineering work, unsuitable

soil conditions, and such chemical, electrochemical or electrical influences as

were not assumed at the time of the Contract.

7. All liability for consequences of any in expert alterations or repairs carried out by

the Purchaser or a third party shall be waived.

8. The period of liability for faults in repairs shall be 3 months, for replacement and

renewal 6 months. However, the said period shall run at least until the expiry of

the warranty period as originally provided for in respect of the contractual

goods.

If parts of supplies cannot be put into efficient operation owing to an interruption

of work caused by repairs, replacements or corrected services, the period of

liability for faults for such parts shall be extended by the same period of

interruption.

9. The provisions concerning periods of liability under paragraphs 1, 5 and 8 shall

not apply where longer periods are enforced by law.

10. The Supplier or the Supplier's agent(s) shall in no event be liable to the

Purchaser for any further claims, particularly claims for damages not effecting

the goods themselves. This shall not apply where liability is enforced by law as

in cases of personal injury or of damage to private property pursuant to the

Product Liability Act or as in cases of intent gross negligence, or failure in

assured characteristics.

11. Sub-sections 1 to 10 shall apply accordingly to claims of the Purchaser

concerning repair, replacement, or damages originating from proposals or

advice given within the scope of the contract or originating from a breach or

statutory contractual obligations.

X. IMPOSSIBILITY OF PERFORMANCE: ADJUSTMENT OF CONTRACT

1. If the Supplier or the Purchaser are unable to perform their supplies or services,

general legal principles shall apply, subject to the following conditions:-

If the Supplier is held responsible for inability, the Purchaser is entitled to claim

damages. However, the liability of the Supplier shall be limited to 10% of the

value of that part of services or supplies which, owing to the inability, cannot be

put into useful operation. Damages of the Purchaser exceeding the said margin

of 10% are excluded. This does not apply where liability is enforced by law in

cases of intent or gross negligence. The right of the Purchaser to cancel the

Contract shall remain unaffected.

2. Insofar as unforeseen events as described under Section V Subsection 3

paragraph 1 materially affect the economic consequences or substance of the

supplies or services or have a major effect on the Supplier's business, the

Contract shall be adjusted reasonably with good faith. If this is not justifiable

from an economic point of view, the Supplier may cancel the Contract. If he

wishes to exercise this right of cancellation, he shall inform the Purchaser of

such an intention immediately after recognising the significance of the event.

This shall apply even where in the first instance an extension of the delivery

period has been agreed upon with the Purchaser.

XI. FURTHER CLAIMS FOR DAMAGES

Claims for damages on the part of the Purchaser arising from breach of secondary

contractual obligations, obligations during the stage of contractual negotiations and tort

are excluded. This does not apply where liability is enforced by law as in cases of

personal injury or of damage to private property pursuant to the Product Liability Act or

as in cases of intent or gross negligence. This limitation shall apply accordingly in

respect of the Purchaser.

XII. PLACE OF JURISDICTION

1. The parties hereby submit to the exclusive jurisdiction of the County Courts of

Landgericht, Bielefeld, Germany.

2. The parties hereto agree that their contractual relationship in connection with

the Supply and/or delivery of goods and services shall be governed by and

construed in accordance with the laws of the Republic of Germany.

XIII. VALIDITY OF CONTRACT

If any provision of this Contract is void the remaining part of the Contract shall remain

unaffected. This shall not apply if adherence to the Contract should mean an

unreasonable hardship to any one party.

Your Shopping Cart

Added to shopping cart.
Go to the shopping cart Request offer Continue shopping.

Are you sure?

Fast Entry

Please enter an exact item number (e.g., 2002-1201) and confirm your entry with the “Enter” key. Use the “Tab” key to navigate between the columns.
Order quantity: Max. {0}
PU (SPU): pcs
Please wait ...

orderlist with csv import

Import your order list file in the following format:
  • CSV files only
  • [article number] separator [set]
  • One item per line

Add from orderlist

Copy your order list to the text box in the following format:
  • [article number] separator [quantity]
  • One item per line
Change Country

You are leaving the currently selected country website and will be logged out. Your user account only applies to one country. Your newly selected country website has other contacts and may have different content and functions.

Copy watchlist

Please enter a unique name for the new watch list. Then all noted products, downloads and pages are copied to the new watch list.