Whether an administrative building, school or hospital – many such non-residential buildings follow a standardized pattern with repeating tasks. That’s exactly what the WINSTA® system is designed for. Would you like to see what our solutions look like in practice? Here you’ll find a selection of highlight projects implemented with pluggable building installation.

Learn about other customers’ experience with our WINSTA® Pluggable Connection System and pluggable electrical installation in general.

Customer Application Highlights

Pluggable Electrical Installation in Practice

Dissen, Day Care Center

For a new nursery and kindergarten built with wood frame construction, the electrical planners relied on pluggable building installation – and broke new ground in the process.

  • The focus: Building installation
  • The objective: To implement a complete building installation with minimum assembly time and allow straightforward connection to electrical components.
  • The challenge: The first groups were scheduled to start after just 12 weeks of construction

Flensburg, Duborg-Skolen

In this extensive school modernization project, old school walls meet a modern lighting concept.

  • The focus: Building and lighting automation
  • The objective: To implement a contemporary lighting concept for classrooms, common areas and administrative offices
  • The highlight: Natural daylight was simulated with intelligent lighting control
MM-4113_Reference_Duborg_Skole_Flensburg_18_7188_2000x1125.jpg

Osnabrück, L&T Sports Center

The perfect lighting at all times: The indoor surf pool and the latest athletic fashions are highlights of the L&T fashion boutique and sports center.

  • The focus: Lighting installation and automation
  • The objective: To provide a variety of alternating scenes for products and events with a flexible lighting concept
  • The highlight: Every LED light can be controlled separately through the central controller
building_licht_l-und-t_sporthaus_wellenbad_surfen_2000x1500.jpg

Herford, Hospital

A project that requires flexibility: The rooms, and a total of 700 beds, were renovated and modernized during ongoing operations at Herford Hospital.

  • The focus: Room installation
  • The objective: To equip rooms with a uniform cabling standard while ensuring simple pre-assembly
  • The highlight: Pluggable electrical installation reduced the installation time by 70 % and the costs by 30 %

Bern (CH), Swiss Post

A major relocation project: The imposing new “Majowa” building is a special challenge – in terms of installation technology too. By opting for a pluggable installation system, the planners hoped to avoid mistakes and save time.

  • The focus: Building installation
  • The objective: To install all building technology systems – such as lighting, blinds, heating, ventilation and air-conditioning – while maximizing time savings and reliability.
  • The highlight: Using the pluggable connection system makes not only the installation, but also the subsequent maintenance easier and more efficient
building_referenz_majowa_gebaeude_aussen_zug_bahn_1_2000x1125.jpg

Tübingen, Zinser Fashion House

Tradition meets modernity: In the course of the redesign, the fashion house’s lighting is being completely converted to LED technology. Approximately 7,500 new lights were installed during ongoing operations.

  • The focus: Lighting installation
  • The objective: To improve the illumination of the showrooms through a new lighting concept while increasing energy efficiency with LED technology
  • The highlight: Thanks to pluggable electrical installation, all the lights could be installed quickly during ongoing operations, with no errors. A bonus: Thanks to the simple handling, in-house facility management will be able to handle minor maintenance in the future.

Geneva (CH), World Intellectual Property Organization

WIPO’s new building houses one of the largest conference rooms in Geneva. Around 1,200 spotlights shine down from the permanently mounted false ceiling like stars in the night sky.

  • The focus: Lighting installation
  • The objective: Convenient light connection with easy maintenance options
  • The highlight: Pre-wiring the ceiling with WINSTA® minimizes the time spent on installation
building_referenz_wipo_1200-spots_2000x1500.jpg

This May Also Interest You

Perfectly Plugged Electrical Installations – with WINSTA®

winsta-gesamt_2000x2000px.jpg

Building Solutions

Your Partner for Building Automation and Installations
mm-31018_key-visuals-industrie-sectors_building_2000x1125.jpg