[{"url":"/industries","name":"Solutions","linkClass":null,"categoryCode":null},{"url":"/power-engineering","name":"Power Engineering ","linkClass":null,"categoryCode":null},{"url":"/power-engineering/renewable-energy-generation","name":"Renewable Energy Generation","linkClass":"active","categoryCode":null}]
energy_wechselrichter_solar_windkraft_gettyimages-522921291_2000x2000.jpg

Secure Connection to the Energy Transition

The main objective of the power generation and distribution industry is ensuring power supply safety and reliability. WAGO products provide the greatest degrees of safety and quality. We have a complete line of products from electrical interconnection technologies to automation solutions.

Operators of ecopower plants fiercely compete for the cheapest kilowatt hour and must pay attention to efficiency and low costs when installing their systems. They are also required to connect systems of a certain size to the control system of the grid operator so that they can be down-regulated remotely as required. That requires telecontrol communication.

Telecontrol Connection for Customer Substations

Whether power generation plants, storage systems or load customers: When it comes to the medium-voltage connection, customer substations need to be linked through telecontrol technology. Even though the TCRs (technical connection rules) vary from one grid operator to another, in about three quarters of German medium-voltage grid territories, WAGO’s Customer Substation software application lets you establish the connection in just ten minutes, because the application offers standardized, pre-configured software for various grid territories.