News

New Telecontrol Variant of the WAGO PFC200 Controller with PROFIBUS DP Master

p_ur_0750_8206_0025_2000x1125

WAGO's new PFC200 Controller with PROFIBUS DP Master creates gateways between PROFIBUS DP slaves and telecontrol protocols by supporting IEC 60870-5-101/-103/-104, IEC 61850/61400-25 and DNP3 telecontrol protocols. The new PFC200 variant brings additional networking capabilities to electricity, water and gas network applications. This extended temperature version also supports operating temperatures ranging between −20 and +60°C to meet all stringent telecontrol technology requirements.

Your benefits:

  • Compatible with IEC 60870-5-101/-103/-104, IEC 61850/61400-25 and DNP3 telecontrol protocols

  • Supports PROFIBUS as a master

  • CODESYS V2.3 runtime system

  • Temperature range: −20 … +60°C

  • Comprehensive protection with IT security packages such as SSL/TLS 1.2, SSH, VPN and a firewall



Product Overview

Simple Programming, Secure Communication

WAGO's new PFC200 Controller utilizes the Linux® real-time operating system and can be programmed using the industry-proven WAGO-I/O-PRO Configuration Software based on CODESYS GSD files can be easily read in via the integrated PROFIBUS Configurator. A host of comprehensive security measures including SSL/TLS 1.2, SSH, VPN and a firewall protect sensitive production data.

Proven Controller with New Features

The powerful PFC200 Controller's hardware features integrated telecontrol functions and relies on tried-and-true ETHERNET and CAN interfaces like other controllers within the PFC200 family. The new controller with a PROFIBUS DP Master interface and telecontrol functions also has a wide variety of approvals, allowing it to be used in virtually any application. Additionally, nearly every one of the WAGO-I/O-SYSTEM’s 500+ I/O modules is supported by WAGO’s 750 Series local bus. This means that in addition to digital and analog I/O modules, several specialty modules (e.g., 3-phase power measurement module) are available for logging and processing highly varying signals.

Bühnenbild_Controller_2000x1125px.jpg

PLCs for Cost-Effective Control

Control tasks large and small must be cost-effective. WAGO has the right controller for every task and requirement.

Your contact person at WAGO

kontaktmodul_kundenservice_zentrale_300x300_1

Main Office

Mon-Thu 8 am - 5 pm CET

Fri 8 am - 3 pm CET