Customer application
December 16, 2022
Grid Connection of Charging Infrastructure – Quick and Easy
The country needs charging stations. However, these must be connected with telecontrol technology – and in a grid-compliant way. The LEONHARD WEISS company offers this service and more all across Germany. At this company from Göppingen, Baden-Württemberg, the Station Design department relies on flexible hardware and software from WAGO – because the connections function quickly and easily in around two-thirds of all grid territories, and also because this choice lets them retain expertise and added value within the company and remain well-positioned for the future.
The development and expansion of charging infrastructure for e-mobility have become crucial for station design. “A large portion of our work currently focuses on e-mobility. This includes everything, not just charging stations – from the mains transfer point, to after-sales and maintenance services,” says Christian Kong-Lochbihler, Senior Site Engineer in the Station Design department at LEONHARD WEISS. With 20 employees, his department successfully constructs AC and DC high-power charging stations throughout Germany with a charging capacity up to 350 kW.